......... Dam Engineering .........


With a long-standing involvement in the supply of water, FARAZAB has designed and supervised the construction of several dams. FARAZAB dam department, traditionally active in dam engineering, has been responsible for the design and construction supervision of more than one hundred dams. FARAZAB has designed several different earth fill dams with clay cores, that also serve river regulation and irrigation purposes.
Earth fill dams.
Geological and seismological studies.
Geotechnics and foundation treatment.
Soil conservation & watershed management.
 

......... Projects List .........
 
Ajorloo Dam Bafrajerd Dam Baigbaghloo Dam
Danaloo Dam Filekhase Dam Ghanbari Dam
Golfaraj Dam Likvan Dam Norouzabad Dam
Sorkhab Dam Yalghouzaghaj Dam  

 

Ajorloo Reservoir Dam and IrrAjorloo Damigation/Drainage Network
Client West-Azarbijan Regional water company
Locaton:NW of Iran,30 km from Miandoab in West-Azarbijan Province
Scope:Increase potential of Ajorloo River to irrigate 11,700 ha of downstream Iands through an irrigation and drainage network.
Project components: Ajorloo Dam, Diversion levees, irrigation and drainage network
dam type: earhtfill with impervious clay core
height from river base:60m
crest length:500m
reservoir volume:100MCM
earthworks volume estimation:3,000,000 m3
cost of construction work USD 22.4 millions
 

............................................................

Bafrajerd Reservoir DamBafrajerd Dam:
Client: Ardabil water affairs administration
Location: NW of iran,195 km from ardabil in ardabil province
Scope: store 4.5 MCM of bafrajerd river flow to supply potable water to khalkhal town.
Catchments area:3.9.2 km2
River annual intake:6,0 MCM
Dam type: earthfill with imperviouse clay core
Height from river bed: 30m
reservoir volume:6.5 MCM
crest lenth: 350m
earthworks volume:600,000 m3
spillway type: Ogee
spillway crest length:6m
diversion system: bottom outlet (steel pipe)
intake system: intake tower
foundation watertight ness system: grouting curtain
cost of construction: USD 6.8 millions
 

............................................................

Baigbaghloo Reservoir Dam:
Baigbaghloo Dam Client: Ardabil water affairs administration
Location: NW of iran,85 km from ardabil province
Scope: Gathering 2,5 MCM of floods and run-offs of Baigbaghloo river  to irrigate 300 ha of downs term lands, control discharge and take advantage of occurring floods.
catchments area: 97.9 km2
river annual intake: 3.0 MCM
dam type: earth fill with impervious clay core
height from river base:21m
reservoir volume:2.5 MCM
crest length:569 m
earthworks volume:550,000 m3
spillway type: Ogee
spillway crest lenght:14m
diversion system: bottom outlet (steel pipe)
intake system: intake tower
foundation watertight ness system: plastic concrete cutoff wall
cost of constriction: USD 1.93 millions
 

............................................................

Danaloo Reservoir Dam:Danaloo Dam
Client: west_ azarbijan regional water company
Location: NW of iran.7 km from maku in west_ azarbijan province
Scope: regulate and storage catchments area flow to transfer to sari_ su river in cultivation seasons in order to develop and improve shahid ghanbari farmlands.
Catchments area:114km2
river annual intake:1.94nMCM
Dam type: earth fill with impervious clay core
height from bedrock:23m
crest length:370m
reservoir volume:2.065  MCM
spillway: Ogee
earthworks volume:380,000 m3
diversion system: bottom outlet (steel pipe)
intake system: intake tower
foundation water tightness system: grouting curtain
cost of constriction: USD 1.2 millions
 

............................................................

Filekhase Reservoir Dam:
Location: Nw of Iran, 75 km NW of zanjan city in zanjan province
Scope: regulating and storing of catchments are flow in order to develop and improve fleches farmlands.
catchments area:104.85 km2
river annual intake: 4.3 MCM
dam type: earth fill with impervious clay core
height from bedrock:19m
crest lenght:745m
reservoir volume:2.24 MCM
spillway: Ogee
Earthworks Volume:450,000 m3
Diversion system: bottom outlet (stell pipe)
intake system : intake tower
foundation water tightness system: upstream blanket
cost of construction: USD 3,400,000
 

............................................................

Shahid Ghanbari Reservoir Dam and irrigation/Drainage Network:
Ghanbari Dam Client: west_azarbijan regional water company
Location: NW if iran,9km NW of Maku in west_azarbijan province
Scope: regulate and store 28.8 MCM annual flow of Sari_ Su river to optimize  irrigation potential as well as development and improvement of irrigation/drainage system in 5,000 ha in shahid ghanbari plain farmlands.
in this project Sari_ Su river flow is diverted by a levee and transferred to the ghanbari reservoir dam through a 4 km length canal. the dam has been planned and constructed to regulate all the river discharged and enhance the irrigation potential to regulate all the river discharged and enhance the irrigation potential in the plain. 29 MCM water potential created by these establishments will be come together with approximately 12.3 MCM annual volume of present springs in the plain.
these amounts of water will be used to develop 1750 ha and improve 3250 ha of the downstream farmlands.
area: 2,471 km2
river annual intake: 48.8 MCM
dam type: earth fill with impervious clay core
height from bedrock:23.5m
crest lenght:594m
reservoir volume:26.5 MCM
spillway: Ogee
spillway crest lenght:8.0m
earthworks volume:770,000 m3
diversion system: bottom outlet (steel pipe)
intake system: intake tower
foundation water lightness system: mainly by grouting curtain(8,000 m drilling length) inspection and grouting gallery with total length of 365m
cost of construction: USD 10 millions
 

............................................................


water supply of Golfaraj, Gordian, Yekanat and Harzandat PlainsGolfaraj Dam:
client: East_ azarbijan and ardabil regional water authority
Location: NW of iran,10 km from jolfa in east_ azarbijan province
Scope: water supply and irrigation of Golfaraj, Gordian, Harzandat and yekant plains (25,000 ha) via establ ishment of pumping systems to take the water from aras river, transfer and store it in four separate reservoir dams along with developing relevant irrigation and drainage network in the plains.
The dams and related reservoirs have been considered to regulate the pumped volume to reduce the required maximum capacity of pumping and transferring system and consequently project costs.
Project components: pumping stations, transferring system, golfaraj dam, gordian dam, harzandat dam, yekanat dam, irrigation and drainage network

 

............................................................


Likvan DamLikvan Reservoir Dam:
client: Ardabil water affairs administration
Location: NW of iran,25 km from kosar in ardabil province
Scope: irrigate 410 ha of farmlands of likvan and firoozabad villages.




 

............................................................


Water supply of jaeer and noruzabad plains( norouzabad reservoir dam):
Client: East_ Azarbijan and ardabil regional water authority
Location: NW of iran,30 km from mianeh in east_a zarbijan province
Scope: take and transfer of ghezel_ ozan river discharge to store in norouzabad
reservoir dam in order to develop downstream farmlands in jeer plain (13,110 ha)
Project components: intake and pumping system, transmission pipeline, norouzabad reservoir dam, irrigation and drainage network
dam type: earth fill with  impervious clay core
height from river bed: 39.3m
reservoir volume:53MCM
spillway type: Ogee
spillway crest length: 6m
diversion system: bottom outlet (steel pipe)
intake system: intake tower
foundation water tightness system: plastic concrete cut_ off wall
cost of construction: USD 14.5 millions.
 

............................................................


Sorkhab reservoir dam projectSorkhab Dam:
client: ardabil water affairs administration (under construction)
Location: NW of iran,55 km from ardabil in ardabil province
Scope: string 1.2 MCM of floods ans run_ offs of aghlaghan river( with a diversion levee and canal) to irrigate 190 ha of lowlands.
Catchments sera: 62.5 km2
river annual intake:11.0 MCM
dam type: earth fill with impervious clay core
height from river base:14 m
reservoir volume: 1.5 MCM
crest length: 220m
gross earth works volume:70,000 m3
spillway type: Ogee
spillway crest length: 3.0m
diversion system: bottom outlet (steel pipe)
intake system: intake tower
foundation water lightness system : upstream impervious blanket
cost of construction: USD 1,364,000
 

............................................................


Yalghouzaghaj DamYalghouzaghj Reservoir Dam Project:
Client: east azarbijan water affairs administraation( under construction)
Location: NW of iran,20 km from gharechaman in east azarbaijan province
Scope: to gather 1.6 MCM of floods and run_ offs of tribal river in yalghouzaghaj reservoir dam to irrigate 170 ha of lowlands.
catchments area: 30.6 km2
river annual discharge:3.4 MCM
dam type: earth with impervious clay core
height from river base:21m
reservoir volume:300,000 m3
spillway type: ogee
spillway crest length:4m
diversion system: bottom outlet (steel pipe)
intake system: intake tower
cost of construction: USD 1,250,000
 

............................................................